Using the attendee totals to solve Booked Solid
At the start of a game, the calendar may appear complex. You will see three meeting rooms (Fishbowl, Broom Cupboard, and Big Table), various time slots, and a stack of meetings of different lengths. It is easy to feel overwhelmed by 3-hour meetings or navigating around the "Lunch" block on weekdays.
The most efficient way to solve these puzzles is to look at the people rather than the rooms first. Underneath the calendar board, you will find a list of attendees—Ada, Bo, Cleo, Dev, and Eun—along with a number next to each name. This number represents the total hours that specific person must be booked for throughout the day.
These totals are your primary constraints. They dictate how many slots each person must occupy.
Identifying the bottleneck person
In every Booked Solid puzzle, there is usually one person who acts as a "bottleneck." This is the attendee with the highest number of total hours. Because everyone must be in every meeting assigned to them, this person's schedule is the hardest to satisfy.
If Ada is booked for 7 hours and Eun is only booked for 3, Ada's schedule is nearly fixed. You cannot move Ada’s meetings around freely because there is very little "empty" time left in their day. If you place a meeting for Bo and Cleo in a way that overlaps with an hour Ada needs to be working, you will create a clash.
Instead of picking a meeting at random, look at the attendee list first. Find the person with the highest number; their requirements will likely dictate where the largest meetings must go.
Comparing total hours to available slots
Once you have identified a bottleneck person, compare their total hours against the actual free space on the calendar.
Some slots are already "Taken" by other teams. On weekdays, the 12pm slot is blocked off for Lunch in every room. This means your available time is fragmented. To solve the puzzle, you must calculate how many unoccupied hours exist across the three rooms.
If Ada needs to be booked for 6 hours, you must find consecutive blocks that accommodate those specific meeting lengths (e.g., a 3-hour block and a 2-hour block and a 1-hour block). You must check if those specific blocks are available or if they are interrupted by "Taken" slots or the Lunch hour.
If a person's total hours match the total number of free slots available in the office, that person’s schedule is effectively "locked." Any meeting involving them must occupy almost every available opening.
Why one person limits everyone else
Every decision you make has a ripple effect because every free slot must be filled by the end of the game. If you place a meeting for Bo and Cleo in a specific room at 10am, you have used up that hour for those two people. However, if Ada also needs to be in a meeting during that same hour to reach their total, you will create a clash.
The bottleneck person limits the rest of the team by claiming certain hours. If Ada is booked for many hours, they will occupy most of the available slots, leaving only smaller gaps for the other attendees.
If you try to place a 3-hour meeting for Dev and Eun in a room that Ada also needs to use for long meetings, you might find yourself unable to fit Ada's requirements into the remaining fragmented slots.
The strategy is simple: 1. Check the attendee totals under the board. 2. Find the person with the most hours (the bottleneck). 3. Map out where their meetings must go based on available consecutive slots. 4. Once the bottleneck's meetings are placed, the remaining meetings for the other attendees will fall into the remaining gaps.
Focusing on attendee totals allows for logical placement rather than trial and error. If you find yourself stuck with a red clash message, do not just move the meeting that caused it—look back at your attendee totals to see if you have accidentally taken away a vital hour from someone else.